Garment manufacturing ERP

Style-level planningGST job work recordsKeep Tally for accountsNo licence lock-in
One BOM
Per style, every size and colour
One BOM
Per style, every size and colour
Job work
Pending pieces per karigar
ITC-04
Data from your challans
You own
Code, data & hosting
Problems we solve

BOM01

One BOM for every size and colour

General ERPs often need a separate bill of materials and order for each variant, so one style becomes hundreds of records. We keep one BOM per style with size and colour rules.

Job work02

No idea what is pending with which karigar

Material goes out to stitching, embroidery and washing, and the only way to check is a phone call. Every challan, receipt and pending piece is tracked per job worker and operation.

Fabric03

Fabric runs out in the middle of an order

Fabric stock lives in a register, not linked to orders. Planning by order shows what each style needs by roll and shade lot, and raises a purchase before you run short.

  • Roll and shade-lot stock
  • Order-linked requirement
  • Reorder alerts
Progress04

Delays found too late to fix

Work-in-progress is tracked on paper or WhatsApp, so a late order shows up at dispatch. Stage-wise progress by bundle or lot makes slippage visible while there is time.

  • Cutting to packing stages
  • Bundle and lot tracking
  • Late-order alerts
GST05

Input credit at risk on unreturned job work

Goods not back from job work within the legal limit are treated as supplied. An ageing view of open challans warns you well before the one-year limit.

  • Challan ageing
  • ITC-04 data
  • E-way bills from challans
Costing06

True cost of a style known only at month-end

Material, wastage and job work charges come together late, in spreadsheets. Costing per order from actual issues and job work bills shows margin while the order is running.

  • Actual vs planned consumption
  • Wastage per order
  • Margin per style
Modules

01

Styles and orders

Buyer orders, styles, size ratios and delivery dates in one place.

  • Buyer and style records
  • Size-ratio orders
02

Fabric and trims

Stock by roll, shade lot, metre and piece, issued against orders.

  • Roll and lot tracking
  • Trims by style
03

Cutting and bundles

Cut plans by size ratio, bundles numbered and followed through each stage.

  • Cut plans
  • Bundle tickets
04

Job work

Challans to karigars and job workers, receipts, pending balances, rates and ITC-04 data.

  • Per-operation tracking
  • GST records
05

Quality and dispatch

Inspection results by order, packing lists and dispatch documents.

  • Inspection records
  • Packing lists
06

Costing and reports

Cost per order and style, and the reports owners ask for every week.

  • Order margin
  • Owner dashboard
Build or buy

01

1. Tally or BUSY with spreadsheets

Fine for small units with few styles. Breaks down as sizes, colours and job workers multiply.

  • Lowest cost
  • Manual tracking
02

2. A general ERP with variants

ERPNext or Odoo can work, but often need one BOM and order per variant unless customised.

  • Strong core
  • Variant workarounds
03

3. A ready garment ERP product

Built for apparel, but you adapt to its way of working and pay licences every year.

  • Faster start
  • Less flexibility
04

4. Custom garment ERP

Built around your process, one module at a time, owned outright. Worth it when the others keep forcing workarounds.

  • Highest fit
  • Higher upfront cost
Selected work

What you get

8 items, none of them extra
A process map from buyer order to dispatch, including job workers
Style-level BOMs with size and colour consumption rules
Job work challans, receipts and pending balances per operation
ITC-04 data and e-way bills prepared from recorded challans
Migration of styles, materials, job workers and open challans, reconciled
Phone-friendly entry for the shop floor and job worker receipts
Tally sync if you keep it for accounts
Source code, database and hosting accounts in your name
How it runs

  1. 01
    First weeks

    Process mapping

    We follow one style from buyer order to dispatch, including every job worker, and note where data is retyped.

    Process map

  2. 02
    Before build

    Module plan

    We pick the module that hurts most, often materials or job work, and price each phase.

    Phase plan · Prices

  3. 03
    Before build

    Data plan

    Styles, materials, job workers, opening stock and open challans, agreed before migration.

    Migration plan

  4. 04
    Phase 1

    First module

    Built, tested on your real styles and used on the floor, with a demo every sprint.

    Working module

  5. 05
    Before switch-over

    Parallel run

    Old registers and the new system run side by side until stock and pending balances match.

    Reconciliation

  6. 06
    Ongoing

    Next modules

    Each further module is priced and built as its own phase.

    Module by module

The stack

  • Node.jsNode.jsBackend
  • PostgreSQLPostgreSQLDatabase
  • ReactReactOffice screens
  • Next.jsNext.jsWeb app
  • TypeScriptTypeScriptLanguage
  • WhatsAppWhatsAppJob worker updates
  • DockerDockerDeployment
  • AWSAWSHosting
FAQ

01What does garment manufacturing ERP software do?
It runs an apparel unit from order to dispatch in one system: styles and buyer orders, a bill of materials for every size and colour, fabric and trims by roll and lot, cutting and bundles, materials sent to job workers, production progress, quality checks, dispatch and costing per order. The goal is one live view instead of separate registers and spreadsheets.
02Can one BOM cover every size and colour of a style?
It should. Many general ERPs need a separate bill of materials and production order for each size and colour, which turns one style into hundreds of records. A garment ERP keeps one BOM per style with consumption rules for each size and colour, and expands it into the exact material requirement for the size ratio on each order.
03How does the ERP handle job work under GST?
It records every challan to a job worker and tracks the pending balance. Under section 143 of the CGST Act, inputs sent for job work must come back or be supplied within one year, and capital goods within three years, or they are treated as supplied on the day they were sent. The ERP flags open challans before those limits and prepares the ITC-04 data.
04How often do we file ITC-04 for job work?
Twice a year, for April to September and October to March, if your aggregate turnover in the previous year was above ₹5 crore, and once a year otherwise, under the rules as amended from October 2021. The ERP builds the return data from the challans already recorded, so filing does not mean rebuilding registers.
05Do we need e-way bills for goods sent to job workers?
Usually yes. An e-way bill is needed when the consignment value is above ₹50,000, even for job work movements, and an inter-State movement from principal to job worker needs one whatever the value. If the job worker is unregistered, the principal generates it. The ERP can create these from the job work challan.
06Can we keep Tally for accounts?
Yes. Many units keep Tally as the accounting book and run styles, materials, production and job work in the ERP, which syncs vouchers, ledgers and masters to Tally. Your accountant keeps the tool they know, and the factory floor gets software built for apparel work.
07How much does garment ERP software cost in India?
It depends on the modules and how much data has to move. As a guide, configuring an existing ERP typically costs ₹1,50,000 to ₹6,00,000 and a custom build ₹6,00,000 to ₹20,00,000, based on the figures in our school software guide. We build one module at a time, usually materials or job work first, with a fixed price for each phase.
08Have you built a garment ERP before?
Not yet, and we would rather say so. We build custom ERP and CRM systems and have delivered business software such as a studio CRM and ERP. For apparel, we spend the first weeks mapping your styles, materials and job work with your production team, and start with one module, so you can judge the fit before committing to more.

Government of India seal
MSME Registered
Government e-Marketplace — GeM